Click on the icon below to view the full list of works or click directly on the numbers to get more information.
- New breakwater to protect the off-shore port of Taranto - western section
- Works for the dredging of 2.3 Mm3 of sediments in the Multipurpose Pier area and for construction on the first lot of the land reclaimed for the expansion of Pier 5 of the Port of Taranto.
- Multi-purpose service centre for port use at the San Cataldo pier in the Port of Taranto
- Upgrading of rail links between the Port of Taranto complex and the national network
- Rainwater drainage, collection and treatment network in the common areas of the port and water and sewage network in the eastern area of the Port of Taranto